Construction (Design and Management) Regulations 2007

The Plan and the File.

The Construction (Design and Management) Regulations 2015 (CDM 2015) came into force on 6 April 2015, replacing CDM 2007. 

What is the difference between a construction phase plan and a health_and_safety file?

The construction phase plan is prepared by the principal contractor, for notifiable projects, to outline the arrangements for managing health_and_safety on site during construction work.

The health_and_safety file is prepared or revised by the CDM co-ordinator, for notifiable projects. It will require the CDM co-ordinator to liaise with the client, designers, principal contractor and contractors. The file will contain information necessary for future construction, maintenance, refurbishment or demolition to be carried out safely, and is retained by the client or any future owner of the property. (Where a client gets non-notifiable work done, and a health_and_safety file already exists for the premises, it should be updated if necessary.) The file should be a useful and valuable document for the client.

For further information, email: helen@stairconsultancy.co.uk

Contact Us »